HOME 首页 > 应用 >
B&B Langhirano
Business: Industrial refrigeration
Application: Meat processing plant
Product: Air cooled condensers
Fluid: R407F
Country/City: Italy
Download PDF
INTERMARCHE’ LOGISTIC CENTER (TOLOSA AREA), installation of - CO2 industrial evaporators with hot glycol defrost. - industrial glycol air coolers - WSS dry coolers
INTERMARCHE’ LOGISTIC CENTER (TOLOSA AREA), installation of - CO2 industrial evaporators with hot glycol defrost. - industrial glycol air coolers - WSS dry coolers
INTERMARCHE’ LOGISTIC CENTER (TOLOSA AREA), installation of - CO2 industrial evaporators with hot glycol defrost. - industrial glycol air coolers - WSS dry coolers
INTERMARCHE’ LOGISTIC CENTER (TOLOSA AREA), installation of - CO2 industrial evaporators with hot glycol defrost. - industrial glycol air coolers - WSS dry coolers
INTERMARCHE’ LOGISTIC CENTER (TOLOSA AREA), installation of - CO2 industrial evaporators with hot glycol defrost. - industrial glycol air coolers - WSS dry coolers
INTERMARCHE’ LOGISTIC CENTER (TOLOSA AREA), installation of - CO2 industrial evaporators with hot glycol defrost. - industrial glycol air coolers - WSS dry coolers
INTERMARCHE’ LOGISTIC CENTER (TOLOSA AREA), installation of - CO2 industrial evaporators with hot glycol defrost. - industrial glycol air coolers - WSS dry coolers
Maxim - Hong Kong
Food processing environment with controlled air conditioning and humidity.
F30, F45, F64 and fast freezers units.
Rong Feng Mushrooms
Mushrooms growing environment with controlled air conditioning and humidity environment.
500 different units including CD45H, F45 & F50.
Industrial unit cooler for textile duct application
HAM SEASONING ROOM - Parma - Italy
SALAMI PROCESSING ROOM - Bretagne - France. HILW industrial unit cooler with stainless steel casing suitable for textile duct
FRUIT AND VEGETABLE STOCK WAREHOUSE - Lyon - France.HDI dual discharge industrial unit coolers
AUCHAN - Luxembourg SHVD air cooled condensers with Spray System.
STOCK WAREHOUSE - Napoli - Italy.HDI industrial unit cooler installation
FRUIT AND VEGETABLE STOCK WAREHOUSE - Lyon - France.HDI industrial unit coolers
COOP WETTINGEN - Zurig - Switzerland GAS COOLER FOR CO2.SHVDT 696 CO2 Gas cooler unit is installed in the first refrigeration installation in the world completely fitted with CO2 transcritical cycle
SKI PLANT - New Zealand. NHI industrial unit coolers
SKI PLANT - New Zealand
SDHV air cooled condenser installation - Rome - Italy
NAVAL BASE - Rota di Cadice - Spain.4 air cooled condensers model SDHVN 258 with fan regulation
DYA Logistic centre - Madrid - Spain - HDI Industrial unit coolers
CARREFOUR Logistic centre - Toulose - France.HILW industrial glycol coolers
AUCHAN - Luxembourg.SHVD air cooled condenser with Spray System
CASADEMONT Salami factory - Spain.SHVDN 805 air cooled condensers with regulation
CARREFOUR - Royssy-en-France - Paris - France. On-line Supermarket - fresh packed food - CHIL 5000 centrifugal unit coolers
Delicatessen factory - Navarra (Spain)
NESTLE' LOGISTIC CENTRE - (Frigo-Kor, Zagabria, 2008) - CS Industrial unit coolers - EHVD air cooled condensers with 10 fans
MEAT FACTORY - Podolsk , Moscow - Refrigeration installation - 20 pcs CS50H industrial unit coolers for textile duct application
FISH COLD STORE - Sachalin Island Refrigeration installation - 8 pcs NHIA 684 GB ammonia unit coolers
FISH COLD STORE - Sachalin Island - Refrigeration installation - 8 pcs NHIA 684 GB ammonia unit coolers
Dunnes Supermarket Group, Dublin - 11 pcs HDI 800 N4 Industrial dual discharge unit coolers
Logistic Centre cold room - Warsaw, Poland - SL Industrial unit cooler
Logistic Centre cold room - Warsaw, Poland - EAV air cooled condenser
Shock Freezing room - Warsaw, Poland - LS 90 Special industrial unit cooler
Logistic Centre near Warsaw, Poland - Air Cooled Condensers
Logistic Centre - Near Warsaw, Poland - Prechamber - HDI Industrial unit cooler
Logistic Centre - Near Warsaw, Poland - Stock - Industrial unit coolers
Cold Store - St. Petersburg - Russia - 2008 - CS Industrial unit cooler
Cold Store - St. Petersburg - Russia - 2008 - EHV90F Air cooled condensers
Cold Store - St. Petersburg - Russia - 2008 - EHV90F Air cooled condenser
COOP Supermarket, Portishead, UK
Hypermarkets "MEGA", "Ramstor"«SPAR», «Magnet", "OKEI", "Auchan“ in Russia
Hypermarkets "MEGA", "Ramstor"«SPAR», «Magnet", "OKEI", "Auchan“ in Russia
Hypermarkets "MEGA", "Ramstor"«SPAR», «Magnet", "OKEI", "Auchan“ in Russia
Poultry Farm "Klenovichi" (Belarus) - Industrial unit coolers CS64H 3412 E 10 spec 45 - 8 units.
Pago warehouse - Katowice - 24C LS80H PAGO is a specialist in comprehensive logistics service of frozen products, established in 2007.
Pago warehouse - Katowice - 24C LS80H PAGO is a specialist in comprehensive logistics service of frozen products, established in 2007.
Pago sorting room - Katowice - 4 HDI dual discharge evaporators PAGO is a specialist in comprehensive logistics service of frozen products, established in 2007.
LDC Bourgogne Louhans, France Industrial refrigeration Industrial unit coolers for textile duct application
CS62W 2206 E6G Rental Cooling Fleet - Chilled warehouse at ferry terminal in Portsmouth
CS62W 2206 E6G Rental Cooling Fleet - Chilled warehouse at ferry terminal in Portsmouth
Centre logistique de STEF located à SENS (150 km south east of Paris)
8 x CD 63W 8620 E6 E
60kW at 0/2 per unit with star connection 49 dB(A)
Centre logistique de STEF located à SENS (150 km south east of Paris)
8 x CD 63W 8620 E6 E
60kW at 0/2 per unit with star connection 49 dB(A)
Centre logistique de STEF located à SENS (150 km south east of Paris)
8 x CD 63W 8620 E6 E
60kW at 0/2 per unit with star connection 49 dB(A)
Shandong Rongfeng Edible Mushroom co., ltd
(hereinafter as Rongfeng) is a hi-tech enterprise specializing in edible
mushroom industry with full strain of research and development.
Cultivation, Processing and Sales.
A staff of 600 people and 4 billion general assets. The factory, which
occupied more than 400 thousand square meters to supply large production
capability, can produce the impressive quantity 150 tons of mushrooms
each day. The main factory is in the Shangdong Region (northwest China)
at about 100 km from Jinan.
Rongfeng has the most advanced
process line in China, which had realized total automation from the
beginning to last procedure. The state of art process line provides the
best temperature, humidity, and ventilation with the installation of
light industrial LU-VE evaporator range F45H, F50HC and CD 45 double
flow range, for a total of 687 unit coolers with set of 114 screw
compressors (3,8 Mw) and also provides a guarantee for quality and
safety. The company has passed ISO/HACCP, and Organic products
certification.
Based on the most advanced process line, modern
management system, and the best human resource in China, this company
has become the biggest production base of Hypsizigus marmoreus.
(Including white beech mushroom, brown beech mushroom). Rongfeng was
awarded “National excellent leading company of Edible Fungus industry”
“Agricultural industrialization focus leading company” and so on.
Shandong Rongfeng Edible Mushroom co., ltd
(hereinafter as Rongfeng) is a hi-tech enterprise specializing in edible
mushroom industry with full strain of research and development.
Cultivation, Processing and Sales.
A staff of 600 people and 4 billion general assets. The factory, which
occupied more than 400 thousand square meters to supply large production
capability, can produce the impressive quantity 150 tons of mushrooms
each day. The main factory is in the Shangdong Region (northwest China)
at about 100 km from Jinan.
Rongfeng has the most advanced
process line in China, which had realized total automation from the
beginning to last procedure. The state of art process line provides the
best temperature, humidity, and ventilation with the installation of
light industrial LU-VE evaporator range F45H, F50HC and CD 45 double
flow range, for a total of 687 unit coolers with set of 114 screw
compressors (3,8 Mw) and also provides a guarantee for quality and
safety. The company has passed ISO/HACCP, and Organic products
certification.
Based on the most advanced process line, modern
management system, and the best human resource in China, this company
has become the biggest production base of Hypsizigus marmoreus.
(Including white beech mushroom, brown beech mushroom). Rongfeng was
awarded “National excellent leading company of Edible Fungus industry”
“Agricultural industrialization focus leading company” and so on.
Shandong Rongfeng Edible Mushroom co., ltd
(hereinafter as Rongfeng) is a hi-tech enterprise specializing in edible
mushroom industry with full strain of research and development.
Cultivation, Processing and Sales.
A staff of 600 people and 4 billion general assets. The factory, which
occupied more than 400 thousand square meters to supply large production
capability, can produce the impressive quantity 150 tons of mushrooms
each day. The main factory is in the Shangdong Region (northwest China)
at about 100 km from Jinan.
Rongfeng has the most advanced
process line in China, which had realized total automation from the
beginning to last procedure. The state of art process line provides the
best temperature, humidity, and ventilation with the installation of
light industrial LU-VE evaporator range F45H, F50HC and CD 45 double
flow range, for a total of 687 unit coolers with set of 114 screw
compressors (3,8 Mw) and also provides a guarantee for quality and
safety. The company has passed ISO/HACCP, and Organic products
certification.
Based on the most advanced process line, modern
management system, and the best human resource in China, this company
has become the biggest production base of Hypsizigus marmoreus.
(Including white beech mushroom, brown beech mushroom). Rongfeng was
awarded “National excellent leading company of Edible Fungus industry”
“Agricultural industrialization focus leading company” and so on.
Shandong Rongfeng Edible Mushroom co., ltd
(hereinafter as Rongfeng) is a hi-tech enterprise specializing in edible
mushroom industry with full strain of research and development.
Cultivation, Processing and Sales.
A staff of 600 people and 4 billion general assets. The factory, which
occupied more than 400 thousand square meters to supply large production
capability, can produce the impressive quantity 150 tons of mushrooms
each day. The main factory is in the Shangdong Region (northwest China)
at about 100 km from Jinan.
Rongfeng has the most advanced
process line in China, which had realized total automation from the
beginning to last procedure. The state of art process line provides the
best temperature, humidity, and ventilation with the installation of
light industrial LU-VE evaporator range F45H, F50HC and CD 45 double
flow range, for a total of 687 unit coolers with set of 114 screw
compressors (3,8 Mw) and also provides a guarantee for quality and
safety. The company has passed ISO/HACCP, and Organic products
certification.
Based on the most advanced process line, modern
management system, and the best human resource in China, this company
has become the biggest production base of Hypsizigus marmoreus.
(Including white beech mushroom, brown beech mushroom). Rongfeng was
awarded “National excellent leading company of Edible Fungus industry”
“Agricultural industrialization focus leading company” and so on.
Project name: G2 International LLC, Technopark Dubai
Refrigeration contractor: Fanar al Khaleej Refrigeration
Execution: 2017-2018
Application: Logistic cold store, dry cold store, chiller and freezer cold rooms
Application with hot gas defrost + electrical in parallel
Cooling system description:
- Chilled receiving area: LU-VE Cubic 2# F50HC 1806 E 7 - 40,6kW (10C_85%_EV-3) R404a
- 7 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 15# F50HC 1808 E 7 - 21,4kW (-20C_85%_EV-27C) R404a
- 2 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 4# F50HC 1806 E 7 - 17,4kW (-20C_85%_EV-27C) R404a
- 1 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 1# F45HC 1320 E 7 - 30,3kW (-20C_85%_EV-27C) R404a
- Corridor: LU-VE Cubic 2# F50HC 1706 E 6 - 40,6kW (5_85%_EV-3) R404a
- Dry storage area (1800sqm): LU-VE Cubic 3# F71HC 4208 N 6 – 65,8kW (22C_65%_EV-27C) R134a
- Technical Store: LU-VE Cubic 1# F45HC 1112 N 4 – 28,9kW (22C_65%_EV-27C) R134a
- Plant room: LU-VE Cubic 1# F35HC 261 N 6 – 19,4kW (25C_65%_EV-27C) R134a
Rack System:
- 1# Profroid 200HP Rack for LT application R404a
- 1# Profroid 120HP Rack for MT application R134a
Project name: G2 International LLC, Technopark Dubai
Refrigeration contractor: Fanar al Khaleej Refrigeration
Execution: 2017-2018
Application: Logistic cold store, dry cold store, chiller and freezer cold rooms
Application with hot gas defrost + electrical in parallel
Cooling system description:
- Chilled receiving area: LU-VE Cubic 2# F50HC 1806 E 7 - 40,6kW (10C_85%_EV-3) R404a
- 7 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 15# F50HC 1808 E 7 - 21,4kW (-20C_85%_EV-27C) R404a
- 2 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 4# F50HC 1806 E 7 - 17,4kW (-20C_85%_EV-27C) R404a
- 1 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 1# F45HC 1320 E 7 - 30,3kW (-20C_85%_EV-27C) R404a
- Corridor: LU-VE Cubic 2# F50HC 1706 E 6 - 40,6kW (5_85%_EV-3) R404a
- Dry storage area (1800sqm): LU-VE Cubic 3# F71HC 4208 N 6 – 65,8kW (22C_65%_EV-27C) R134a
- Technical Store: LU-VE Cubic 1# F45HC 1112 N 4 – 28,9kW (22C_65%_EV-27C) R134a
- Plant room: LU-VE Cubic 1# F35HC 261 N 6 – 19,4kW (25C_65%_EV-27C) R134a
Rack System:
- 1# Profroid 200HP Rack for LT application R404a
- 1# Profroid 120HP Rack for MT application R134a
Project name: G2 International LLC, Technopark Dubai
Refrigeration contractor: Fanar al Khaleej Refrigeration
Execution: 2017-2018
Application: Logistic cold store, dry cold store, chiller and freezer cold rooms
Application with hot gas defrost + electrical in parallel
Cooling system description:
- Chilled receiving area: LU-VE Cubic 2# F50HC 1806 E 7 - 40,6kW (10C_85%_EV-3) R404a
- 7 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 15# F50HC 1808 E 7 - 21,4kW (-20C_85%_EV-27C) R404a
- 2 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 4# F50HC 1806 E 7 - 17,4kW (-20C_85%_EV-27C) R404a
- 1 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 1# F45HC 1320 E 7 - 30,3kW (-20C_85%_EV-27C) R404a
- Corridor: LU-VE Cubic 2# F50HC 1706 E 6 - 40,6kW (5_85%_EV-3) R404a
- Dry storage area (1800sqm): LU-VE Cubic 3# F71HC 4208 N 6 – 65,8kW (22C_65%_EV-27C) R134a
- Technical Store: LU-VE Cubic 1# F45HC 1112 N 4 – 28,9kW (22C_65%_EV-27C) R134a
- Plant room: LU-VE Cubic 1# F35HC 261 N 6 – 19,4kW (25C_65%_EV-27C) R134a
Rack System:
- 1# Profroid 200HP Rack for LT application R404a
- 1# Profroid 120HP Rack for MT application R134a
Project name: G2 International LLC, Technopark Dubai
Refrigeration contractor: Fanar al Khaleej Refrigeration
Execution: 2017-2018
Application: Logistic cold store, dry cold store, chiller and freezer cold rooms
Application with hot gas defrost + electrical in parallel
Cooling system description:
- Chilled receiving area: LU-VE Cubic 2# F50HC 1806 E 7 - 40,6kW (10C_85%_EV-3) R404a
- 7 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 15# F50HC 1808 E 7 - 21,4kW (-20C_85%_EV-27C) R404a
- 2 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 4# F50HC 1806 E 7 - 17,4kW (-20C_85%_EV-27C) R404a
- 1 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 1# F45HC 1320 E 7 - 30,3kW (-20C_85%_EV-27C) R404a
- Corridor: LU-VE Cubic 2# F50HC 1706 E 6 - 40,6kW (5_85%_EV-3) R404a
- Dry storage area (1800sqm): LU-VE Cubic 3# F71HC 4208 N 6 – 65,8kW (22C_65%_EV-27C) R134a
- Technical Store: LU-VE Cubic 1# F45HC 1112 N 4 – 28,9kW (22C_65%_EV-27C) R134a
- Plant room: LU-VE Cubic 1# F35HC 261 N 6 – 19,4kW (25C_65%_EV-27C) R134a
Rack System:
- 1# Profroid 200HP Rack for LT application R404a
- 1# Profroid 120HP Rack for MT application R134a
Project name: G2 International LLC, Technopark Dubai
Refrigeration contractor: Fanar al Khaleej Refrigeration
Execution: 2017-2018
Application: Logistic cold store, dry cold store, chiller and freezer cold rooms
Application with hot gas defrost + electrical in parallel
Cooling system description:
- Chilled receiving area: LU-VE Cubic 2# F50HC 1806 E 7 - 40,6kW (10C_85%_EV-3) R404a
- 7 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 15# F50HC 1808 E 7 - 21,4kW (-20C_85%_EV-27C) R404a
- 2 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 4# F50HC 1806 E 7 - 17,4kW (-20C_85%_EV-27C) R404a
- 1 cold stores dual application Chiller/Freezer (various sizes): LU-VE Cubic 1# F45HC 1320 E 7 - 30,3kW (-20C_85%_EV-27C) R404a
- Corridor: LU-VE Cubic 2# F50HC 1706 E 6 - 40,6kW (5_85%_EV-3) R404a
- Dry storage area (1800sqm): LU-VE Cubic 3# F71HC 4208 N 6 – 65,8kW (22C_65%_EV-27C) R134a
- Technical Store: LU-VE Cubic 1# F45HC 1112 N 4 – 28,9kW (22C_65%_EV-27C) R134a
- Plant room: LU-VE Cubic 1# F35HC 261 N 6 – 19,4kW (25C_65%_EV-27C) R134a
Rack System:
- 1# Profroid 200HP Rack for LT application R404a
- 1# Profroid 120HP Rack for MT application R134a
Project name: Cold store and packaging facility for agri product in Cairo
Refrigeration contractor: MOG for Engineering and Industry, 10th of Ramadan Industrial City, Egypt
Execution 2018
Application: facility for collection, precooling, packaging and storage of various fruits and vegetables (lemon, oranges, strawberry, peas, pomegranate etc.). This project is part of a larger plan to develop the agricultural industry of Egypt, by boosting the facilities to serve the export market (Mainly northern Europe and Russia). Currently two additional cold store are under installation and commissioning.
Cooling system description:
- Chilled receiving area: LU-VE Dual Discharge 3# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R407c
- 2 precooling rooms: LU-VE Cubic 4# CS71H 4416 E 10 - 67,3kW (0C_85%_EV-5C) R404a
- Production and packaging hall: LU-VE Dual Discharge 12# CD50H 9456 N 6 - 69,9kW (18C_85%_EV5) R407c
- 6 receiving rooms: LU-VE Cubic 6# CS62H 2218 N 6 - 140,8kW (15C_85%_EV5) R407c
- 6 cold stores: LU-VE Cubic 12# F50HC 1714 E 6 - 31,2kW (0C_85%_EV-5C) R404a
- Shipping area: LU-VE Dual Discharge 5# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R404a
Rack System:
- 4# Emerson 200HP Rack for MT application R407c – 4# LU-VE Condensers EHV90F 374 H 8VENT (2X4)
- 2# Emerson 180HP Rack for LT application R404a – 2# LU-VE Condensers EAV8S 7231 H 6VENT (2X3)
- 1# Emerson 200HP Rack for LT application R404a – 1# LU-VE Condensers EHV90F 368 H 6VENT (2X3)
Project name: Cold store and packaging facility for agri product in Cairo
Refrigeration contractor: MOG for Engineering and Industry, 10th of Ramadan Industrial City, Egypt
Execution 2018
Application: facility for collection, precooling, packaging and storage of various fruits and vegetables (lemon, oranges, strawberry, peas, pomegranate etc.). This project is part of a larger plan to develop the agricultural industry of Egypt, by boosting the facilities to serve the export market (Mainly northern Europe and Russia). Currently two additional cold store are under installation and commissioning.
Cooling system description:
- Chilled receiving area: LU-VE Dual Discharge 3# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R407c
- 2 precooling rooms: LU-VE Cubic 4# CS71H 4416 E 10 - 67,3kW (0C_85%_EV-5C) R404a
- Production and packaging hall: LU-VE Dual Discharge 12# CD50H 9456 N 6 - 69,9kW (18C_85%_EV5) R407c
- 6 receiving rooms: LU-VE Cubic 6# CS62H 2218 N 6 - 140,8kW (15C_85%_EV5) R407c
- 6 cold stores: LU-VE Cubic 12# F50HC 1714 E 6 - 31,2kW (0C_85%_EV-5C) R404a
- Shipping area: LU-VE Dual Discharge 5# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R404a
Rack System:
- 4# Emerson 200HP Rack for MT application R407c – 4# LU-VE Condensers EHV90F 374 H 8VENT (2X4)
- 2# Emerson 180HP Rack for LT application R404a – 2# LU-VE Condensers EAV8S 7231 H 6VENT (2X3)
- 1# Emerson 200HP Rack for LT application R404a – 1# LU-VE Condensers EHV90F 368 H 6VENT (2X3)
Project name: Cold store and packaging facility for agri product in Cairo
Refrigeration contractor: MOG for Engineering and Industry, 10th of Ramadan Industrial City, Egypt
Execution 2018
Application: facility for collection, precooling, packaging and storage of various fruits and vegetables (lemon, oranges, strawberry, peas, pomegranate etc.). This project is part of a larger plan to develop the agricultural industry of Egypt, by boosting the facilities to serve the export market (Mainly northern Europe and Russia). Currently two additional cold store are under installation and commissioning.
Cooling system description:
- Chilled receiving area: LU-VE Dual Discharge 3# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R407c
- 2 precooling rooms: LU-VE Cubic 4# CS71H 4416 E 10 - 67,3kW (0C_85%_EV-5C) R404a
- Production and packaging hall: LU-VE Dual Discharge 12# CD50H 9456 N 6 - 69,9kW (18C_85%_EV5) R407c
- 6 receiving rooms: LU-VE Cubic 6# CS62H 2218 N 6 - 140,8kW (15C_85%_EV5) R407c
- 6 cold stores: LU-VE Cubic 12# F50HC 1714 E 6 - 31,2kW (0C_85%_EV-5C) R404a
- Shipping area: LU-VE Dual Discharge 5# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R404a
Rack System:
- 4# Emerson 200HP Rack for MT application R407c – 4# LU-VE Condensers EHV90F 374 H 8VENT (2X4)
- 2# Emerson 180HP Rack for LT application R404a – 2# LU-VE Condensers EAV8S 7231 H 6VENT (2X3)
- 1# Emerson 200HP Rack for LT application R404a – 1# LU-VE Condensers EHV90F 368 H 6VENT (2X3)
Project name: Cold store and packaging facility for agri product in Cairo
Refrigeration contractor: MOG for Engineering and Industry, 10th of Ramadan Industrial City, Egypt
Execution 2018
Application: facility for collection, precooling, packaging and storage of various fruits and vegetables (lemon, oranges, strawberry, peas, pomegranate etc.). This project is part of a larger plan to develop the agricultural industry of Egypt, by boosting the facilities to serve the export market (Mainly northern Europe and Russia). Currently two additional cold store are under installation and commissioning.
Cooling system description:
- Chilled receiving area: LU-VE Dual Discharge 3# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R407c
- 2 precooling rooms: LU-VE Cubic 4# CS71H 4416 E 10 - 67,3kW (0C_85%_EV-5C) R404a
- Production and packaging hall: LU-VE Dual Discharge 12# CD50H 9456 N 6 - 69,9kW (18C_85%_EV5) R407c
- 6 receiving rooms: LU-VE Cubic 6# CS62H 2218 N 6 - 140,8kW (15C_85%_EV5) R407c
- 6 cold stores: LU-VE Cubic 12# F50HC 1714 E 6 - 31,2kW (0C_85%_EV-5C) R404a
- Shipping area: LU-VE Dual Discharge 5# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R404a
Rack System:
- 4# Emerson 200HP Rack for MT application R407c – 4# LU-VE Condensers EHV90F 374 H 8VENT (2X4)
- 2# Emerson 180HP Rack for LT application R404a – 2# LU-VE Condensers EAV8S 7231 H 6VENT (2X3)
- 1# Emerson 200HP Rack for LT application R404a – 1# LU-VE Condensers EHV90F 368 H 6VENT (2X3)
Project name: Cold store and packaging facility for agri product in Cairo
Refrigeration contractor: MOG for Engineering and Industry, 10th of Ramadan Industrial City, Egypt
Execution 2018
Application: facility for collection, precooling, packaging and storage of various fruits and vegetables (lemon, oranges, strawberry, peas, pomegranate etc.). This project is part of a larger plan to develop the agricultural industry of Egypt, by boosting the facilities to serve the export market (Mainly northern Europe and Russia). Currently two additional cold store are under installation and commissioning.
Cooling system description:
- Chilled receiving area: LU-VE Dual Discharge 3# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R407c
- 2 precooling rooms: LU-VE Cubic 4# CS71H 4416 E 10 - 67,3kW (0C_85%_EV-5C) R404a
- Production and packaging hall: LU-VE Dual Discharge 12# CD50H 9456 N 6 - 69,9kW (18C_85%_EV5) R407c
- 6 receiving rooms: LU-VE Cubic 6# CS62H 2218 N 6 - 140,8kW (15C_85%_EV5) R407c
- 6 cold stores: LU-VE Cubic 12# F50HC 1714 E 6 - 31,2kW (0C_85%_EV-5C) R404a
- Shipping area: LU-VE Dual Discharge 5# CD50H 9452 N 6 - 23,7kW (16C_85%_EV5) R404a
Rack System:
- 4# Emerson 200HP Rack for MT application R407c – 4# LU-VE Condensers EHV90F 374 H 8VENT (2X4)
- 2# Emerson 180HP Rack for LT application R404a – 2# LU-VE Condensers EAV8S 7231 H 6VENT (2X3)
- 1# Emerson 200HP Rack for LT application R404a – 1# LU-VE Condensers EHV90F 368 H 6VENT (2X3)
FIJI Island, Suva
Industrial refrigeration - Frozen chicken storage
8x CS50H 1820 E 7 + Plug&Save
Additional info
Unit coolers completed with electronic expansion valve and Plug&Save device
Electric defrost
Vietnam, Ho Chi Minh
39pz LS, ammoniaca hot gas defrost
73pz CS, glycol
Casing aisi 304, aisi 304 fan grills, top connections, alupaint fins
AMUL – Vasundhara Dairy, NAGPUR- MAHARASTHRA
CS71H 4508 GB 12 x 19 pcs + CS71H 4522 GB 12 x 2 Pcs + F35HC 174 E x 20 pcs
APEX FROZEN FOOD – KAKINADA ANDHRA PRADESH
CS45W 1114 N 4 F x 6 Pcs + CS45W 1106 N 4 E x 5 pcs + CS45W 1102 N 4 C x 5 pcs + CS45W 1100N 4 C x 15 pcs. (Heresite Coating + IP66 Mot + Fiber Fan Blade + Filter + Cabling).
ASPAM COLD STORE – RAI HARYANA
LS80H 7818 E 7 EC Fans x 21 pcs + F62HC 2312 E 7 x 6pcs + F62HC 2314 N 7 x 8 pcs.
CHEEMA FROZEN FOODS – KASHIPUR UTTAR PRADESH
LS50A 5806 E 7 x 12 pcs.
COASTAL AQUA FROZEN FOODS – KAKINADA ANDHRA PRADESH
F50HC 1914 E 10 X 6 pcs + F50HC 1906 E 10 x 2 pcs.
GK AGRO Cold store – KUNDLI HARYANA
F62HC 2312 N 7 x 8 pcs.
COLDMAN - Bangalore/Chennai/ Guwahati
CS80H 3806 E 7 + FF63H 644 E 7 + EAV9N condensers.
COLDMAN - Bangalore/Chennai/ Guwahati
CS80H 3806 E 7 + FF63H 644 E 7 + EAV9N condensers.
COLDMAN - Bangalore/Chennai/ Guwahati
CS80H 3806 E 7 + FF63H 644 E 7 + EAV9N condensers.
KERN LOGISTICS – CHENNAI TAMIL NADU
F62HC 2314 E 7 x 5 pcs + F50HC 1814 E 7 x 2 pcs + F45hC 1314 E 7 x 4 pcs.
LAWARANCE COLD STORE – KUNDLI HARYANA
F45HC 1206 E 6 x 28 pcs.
PEETAMBER COLD STORE - KUNDLI HARYANA
F45HC 1206 E 6 x 28 pcs.
VERKA – LUDHIANA PUNJAB
F64HC 3406 E 10 x 14 pcs + ACC XAV9K x 2 pcs.
VERKA – LUDHIANA PUNJAB
F64HC 3406 E 10 x 14 pcs + ACC XAV9K x 2 pcs.
KBB NUTS – KUNDLI HARYANA
F35HCW x 20 pcs.
AR TRANSMISSION – BADDHI HIMACHAL PRADESH
CS62H 2312 E 7 x 8 Pcs + XAV 9K x 1 No.
PRIMA COLD STORE – COLOMBO SRI LANKA
CS45H 1312 E 7 x 7 pcs + CD45H 8106 N 4 x 4 Pcs + EHAV 90F 354 H 4 vent x 1 no.
PRIMA COLD STORE – COLOMBO SRI LANKA
CS45H 1312 E 7 x 7 pcs + CD45H 8106 N 4 x 4 Pcs + EHAV 90F 354 H 4 vent x 1 no.
B1- MEGAFOOD PARK – DERAS ODISHA
SDHN x 20 pcs.
FRARM FRESH APPLES – SOPIAN KASHMIR
IKEA – HYDERABAD TELANGANA & MUMBAI MAHARASTHRA
IKEA – HYDERABAD TELANGANA & MUMBAI MAHARASTHRA
GUBBA COLD STORE – BEPA SOLAPUR COLD STORE, SOLAPUR MAHARASTHRA
Potato Cold Storage for Lays (PepsiCo) in Turkey.
Condensers:
4 x XDHV1X 4145+SUBC+EC+GRILLE
Evaporators:
8 x LS50H 5824 E 7
+ INOX BODY
+EC FANS
Prestigious customer with similar cold store.
It has been proved that the reduction of energy consumption (coupled with Polaref raks, with Bitzer compressor) is 45 to 50% yearly.
Challenge of maintaining the humidity at 97%, and 1°C decrease in temperature every 12 hours.
Carrefour Masdar City
Super market cold stores and preparation rooms
Evaporator:
20 x F31HC/F35HC CO2, FHD CO2,
Gas Cooler:
1 x SAV9T 3232 CO2 + P25 + EC + IS
First CO2 installation in the GCC countries.
Masdar City is the first sustainable city in the GCC, where “green” initiatives are implemented.
Technical challenge: CO2 transcritical in an area that reaches 50°C, made possible by LU-VE adiabatic dry cooler.
Carrefour Masdar City
Super market cold stores and preparation rooms
Evaporator:
20 x F31HC/F35HC CO2, FHD CO2,
Gas Cooler:
1 x SAV9T 3232 CO2 + P25 + EC + IS
First CO2 installation in the GCC countries.
Masdar City is the first sustainable city in the GCC, where “green” initiatives are implemented.
Technical challenge: CO2 transcritical in an area that reaches 50°C, made possible by LU-VE adiabatic dry cooler.
Carrefour Masdar City
Super market cold stores and preparation rooms
Evaporator:
20 x F31HC/F35HC CO2, FHD CO2,
Gas Cooler:
1 x SAV9T 3232 CO2 + P25 + EC + IS
First CO2 installation in the GCC countries.
Masdar City is the first sustainable city in the GCC, where “green” initiatives are implemented.
Technical challenge: CO2 transcritical in an area that reaches 50°C, made possible by LU-VE adiabatic dry cooler.